Saskatoon’s Legalizing Existing Suites (LES) Program is a local route for some older secondary suites. The City describes eligibility for a suite in a detached, one-unit dwelling that was installed before January 1, 1999. A suite in a semi-detached dwelling is excluded from the LES program under the City’s current guidance. Building type and the dates of both the home and suite matter, so confirm the facts and applicable bylaw route with Saskatoon before preparing an application.

Ask the City to assess the existing suite

For a potentially eligible suite, the City asks the owner to provide evidence of the installation date and request an inspection. Examples of date evidence include written neighbor testimony, older real-estate listings and dated photographs; the City determines whether the evidence is acceptable. The inspection can review permitted use, permit records and visible construction, including ventilation, stairs, fire-safety features, windows and doors. The resulting report identifies work for legalization or indicates whether another route, such as removal, applies.

Suites installed after the program’s date cutoff are not eligible for the revised LES standards and must meet the applicable National Building Code requirements. For a semi-detached building, the City says a second unit requires conversion of the building to a multiple-unit dwelling and compliance with the relevant code. These are different paths from the older detached-home program.

Final approval depends on permits and inspection

The City may require building and/or plumbing permits, including separate permits for unauthorized plumbing, before the owner completes corrections. Saskatoon says an occupancy permit is issued after the required work and final inspection confirm LES requirements. An initial inspection or a favorable date assessment is not the final occupancy record. The City lists an application fee of C$2,250 effective January 1, 2026; recheck the current fee and linked forms before applying.

Use Saskatoon’s current LES guidance to confirm eligibility, date evidence, code path and forms. For an individual property, match the final permit and occupancy records to the current layout and use.